Guiding
Principles to the Implementation of IEC-61508
SIPI61508: ACKNOWLEDGEMENTS FOR CONTRIBUTIONS A European Project to Harmonise the Application of IEC-61508
The Project Partners gratefully acknowledge all contributions to
the SIPI Technical Data Resource. We are indebted to all the individuals
and organisations that have provided material for inclusion in the open
database of Functional Safety related information.
If you are able to contribute papers, articles, case studies or
examples of procedures, methodologies, techniques or any other material
relating to Functional Safety issues the partners will be pleased to include
them within the database.
The following, specific acknowledgements are made: -
Institute of Measurement and Control
Articles provided by the Institute
of Measurement and Control, which appear on the SIPI web, site were first
published in 'Measurement and Control', the official journal of the Institute
of Measurement and Control. These are reproduced with permission from
the Institute.
Health and Safety Executive
Permission
has been given to include the cover and title pages, forward, contents
and executive summary of certain documents commissioned by the HSE. The
full texts can be obtained from the HSE at the address contained with
in the document or by visiting the HSE web site: www.hse.gov.uk
and following the “Research” link.
Institution of Electrical Engineers
SIPI61508
acknowledges the kind permission of The IEE to reproduce papers first
presented at the IEE Seminar “Safety Instrumented Systems and IEC61511
- So what's new?” held at the Queens Hotel, Leeds on Tuesday 2 December
2003
For the conditions under which the
SIPI Technical Data Resource is provided and contributions accepted please
see the SIPI Intellectual Property Rights statement, accessible from the
left menu.